Service 08

OT and ICS security assessment

Protect SCADA, DCS and industrial control systems without disrupting live operations. Aligned to IEC 62443 and NIST SP 800-82.

Standards
IEC 62443, NIST SP 800-82
Approach
Passive, zero disruption
Reference model
Purdue model

Industrial security without disruption

Operational technology has unique constraints: legacy systems, proprietary protocols, round the clock uptime and safety critical consequences. Standard IT security tools can cause outages, or worse.

Our OT team uses passive network analysis, purpose built OT tools and sector knowledge to assess your environment safely, giving you a clear risk picture without touching production.

Covers

  • SCADA
  • DCS
  • PLC
  • Modbus
  • DNP3
  • IEC 61850
  • IEC 62443
  • NIST SP 800-82
  • Purdue model

Assessment areas

AreaWhat it covers
Network architecture reviewIT and OT boundary analysis, DMZ configuration and segmentation, using the Purdue model as reference.
Passive asset discoveryNon-invasive identification of every OT asset and communication pattern, with no active scanning.
Vulnerability assessmentCVE mapping for OT devices, firmware analysis and protocol review for Modbus, DNP3 and IEC 61850.
IEC 62443 complianceZone and conduit model, security level assessment and a prioritised remediation roadmap.

What every engagement includes

  • Passive OT asset discovery
  • IT and OT boundary review
  • Protocol security analysis
  • CVE mapping for OT devices
  • IEC 62443 gap assessment
  • Remediation roadmap

Fixed price per engagement. Custom scopes are quoted after a scoping call. All work is covered by an NDA.

From first call to closed findings

A typical web application engagement. Larger scopes take longer, and we fix the exact plan on the scoping call.

  1. 1

    Day 0

    Discovery call

    We understand your environment, threat model and what the result needs to prove.

  2. 2

    Day 2

    Scope and authorisation

    Rules of engagement, timelines and methodology, signed before any testing.

  3. 3

    Day 3 to 12

    Testing

    Manual testing by senior consultants, with daily status updates.

  4. 4

    Day 14

    Report

    Findings with risk ratings, proof and the exact steps to fix each one.

  5. 5

    Day 30

    Retest and attestation

    We verify your fixes and issue a signed attestation letter.

Sample timeline. Your dates are agreed during scoping.

Secure your industrial operations

We work with power, energy, manufacturing, water treatment and other critical infrastructure operators across India.