Service 08
OT and ICS security assessment
Protect SCADA, DCS and industrial control systems without disrupting live operations. Aligned to IEC 62443 and NIST SP 800-82.
- Standards
- IEC 62443, NIST SP 800-82
- Approach
- Passive, zero disruption
- Reference model
- Purdue model
Industrial security without disruption
Operational technology has unique constraints: legacy systems, proprietary protocols, round the clock uptime and safety critical consequences. Standard IT security tools can cause outages, or worse.
Our OT team uses passive network analysis, purpose built OT tools and sector knowledge to assess your environment safely, giving you a clear risk picture without touching production.
Covers
- SCADA
- DCS
- PLC
- Modbus
- DNP3
- IEC 61850
- IEC 62443
- NIST SP 800-82
- Purdue model
Assessment areas
| Area | What it covers |
|---|---|
| Network architecture review | IT and OT boundary analysis, DMZ configuration and segmentation, using the Purdue model as reference. |
| Passive asset discovery | Non-invasive identification of every OT asset and communication pattern, with no active scanning. |
| Vulnerability assessment | CVE mapping for OT devices, firmware analysis and protocol review for Modbus, DNP3 and IEC 61850. |
| IEC 62443 compliance | Zone and conduit model, security level assessment and a prioritised remediation roadmap. |
What every engagement includes
- Passive OT asset discovery
- IT and OT boundary review
- Protocol security analysis
- CVE mapping for OT devices
- IEC 62443 gap assessment
- Remediation roadmap
Fixed price per engagement. Custom scopes are quoted after a scoping call. All work is covered by an NDA.
From first call to closed findings
A typical web application engagement. Larger scopes take longer, and we fix the exact plan on the scoping call.
- 1
Day 0
Discovery call
We understand your environment, threat model and what the result needs to prove.
- 2
Day 2
Scope and authorisation
Rules of engagement, timelines and methodology, signed before any testing.
- 3
Day 3 to 12
Testing
Manual testing by senior consultants, with daily status updates.
- 4
Day 14
Report
Findings with risk ratings, proof and the exact steps to fix each one.
- 5
Day 30
Retest and attestation
We verify your fixes and issue a signed attestation letter.
Sample timeline. Your dates are agreed during scoping.
Secure your industrial operations
We work with power, energy, manufacturing, water treatment and other critical infrastructure operators across India.